Technical School

Remodeled computer labs, EET labs, including drywall, electrical, mechanical, (air conditioning) painting, and flooring. The public corridor flooring was inlaid VCT tile in multiple colors. Additionally, the chair rail employed in the public corridors is multicolored with wall covering below the rail.

The was a total renovation of all existing restrooms, including ceramic floor and wall tile, new metal toilet partitions, toilets, lavatories, and paint above the wall tile. New ceiling tile was also installed.